Systems Development & Design paper writing service

Module Aim:

This module is intended to lead the student through the stages of Information systems strategy, defining systems requirements and designing, assuring and implementing requirements. The module focuses on the identification, analysis and implementation of computerised business systems to support the management, control and administration of an organisation. The module compares and contrasts Structured Systems Analysis and Design Methodology (SSADM) with alternative approaches to information systems development.

Mapping Report:

Individual component (100%) REPORT (Term 1)

  1. An introduction

We all use numerous systems every day, systems are essentially a group of processes working together. This way of viewing the system and its components may help you understand the system as a whole. In this assignment you are tasked with diagrammatically representing a system, utilising the specified diagrams and models within this brief.

The specific system that you will be modelling will be for an events management system. You will need to work within some specific boundaries, such as staffing and venue (please staff list for more details), however the rest of the brief will be detailed by you.

 

  • You are required to represent these through the following diagrams:
    • Use Case Diagram
    • Physical Data Flow Diagram
    • Logical Data Flow Diagram
    • Sequence Diagram
    • Entity Life History
    • Class Diagram
    • Interaction Diagram

 

  • You are to accompany each diagram with text to highlight and express specific elements contain within. This text should be sufficient to enable the reader to grasp the specific nuances contained within the diagram, detailing its requirements and explaining its context. You are likely to grasp and subsequently map these findings via a method of eliciting the requirements. Consider the specific parameters that each modelling diagram embodies; use these elements to assist you in its application.

 

 

  • Staffing List:
    • Lighting engineers (2)
    • Caterers (4)
    • Florists (1)
    • Security (10)
    • Marshalls (4)
    • Bar staff (6)
    • Ticket Office (3)
    • Merchandising (2)
    • Hospitality (5)
    • Management (3)

 

  1. Venue: TBC

Submission Date for report:

End of Term 1. Please review the VLE to see notifications of the exact date.

 

Is this the question you were looking for? If so, place your order here to get started!