E-Supervision System Evaluation Project:
Task:
Introduction
Description of the final built system and its functionality, including annotated screen shots
Evaluations
The product (did it meet requirements, what else could be done)
Individual (your contribution to the team effort, the presentation and the product)
Group (identify some criteria and rate each member against it)
Methodology (did agile scrum work, how well did the team communicate, design methods used)
Evaluate the database? The database been created using phpMyAdmin
Project Requirements
The system must meet the following criteria:
- All students must have a supervisor and second marker.
- Any authorised member of staff can allocate or reallocate supervisors and second markers to students.
- The student and the staff members will get notification emails when this happens.
- Bulk allocation of students to their supervisor and second marker (eg 10 at a time) needs to be implemented.
- All students and their supervisor and second marker are to use the eSupervision system for messaging, arranging and recording meetings (both real and virtual), uploading documents and commenting on them, and for blogging.
- Email relating to their project between students and staff is to be used only for notification of events recorded in the backend database. No other content is to be sent via email.
- Student and staff data is accessed from the university MIS system. The maintenance of this is outside the scope of this project.
- Each student will have their own personal dashboard summarising their interaction with their supervisor and second marker.
- Each supervisor and second marker will have a dashboard of their project students that can be sorted and filtered appropriately
- Authorised staff will have access to the dashboards of other staff, and to individual project dashboards for students.
- The interface must be suitable for all devices (eg mobile phones, tablets, desktops)
Is this the question you were looking for? If so, place your order here to get started!